Content Roadmap 2026 — Detailed Implementation Plan Read without ads. Become an RTI Wiki donor for Rs.1200/year and help keep RTI guidance hosted. Go ad-free
Need help drafting this RTI? Use our free RTI Assistant — describe your problem, get a ready-to-file Section 6(1) application with your name and address pre-filled. Also handles First Appeal and Second Appeal to the CIC/SIC.
Task-by-task implementation of the RTI Wiki Content Roadmap 2026 — priority, effort, dependencies, and definition-of-done for every recommendation.
What this is. A task-level execution plan derived from the Content Roadmap 2026 . Every recommendation in the roadmap is broken into discrete tasks with priority (P0–P3), effort estimate, dependencies, and a definition of done.
How to read it.
P0 — ship this sprint (can be done in current week).
P1 — next 2–4 weeks.
P2 — this quarter (by end of June 2026).
P3 — next quarter or later.
Status symbols. ✅ done · 🟡 in progress · 🔴 not started.
Live progress. Status reflects on-ground completion as of 21 April 2026. We update this page at end of each week.
Section A — Content expansion
A1. Finish the PIO/FAA knowledge base
= Task = Priority = Effort = Status
Write 17 remaining PIO/FAA articles P0 2 sessions ✅ Done (Track A — 19 articles live, 24 of 25 in total)
Mark all 19 as verified P0 5 min ✅ Done
Update PIO/FAA hub page — convert outlines to live-link blurbs P0 30 min ✅ Done (sidebar PIO/FAA Library reflects live articles)
DoD. 24+ PIO/FAA articles live with full structural template, case law, templates; hub reflects live status; sidebar lists all.
A2. Ship 10 Pillar-1 citizen articles
= Slug = Primary KW = Priority = Status
rti-for-ration-card-cancelled “ration card cancelled rti” P1 ✅
rti-for-marriage-registration “marriage registration rti” P1 ✅
rti-for-birth-certificate “birth certificate rti” P1 ✅
rti-for-death-certificate “death certificate rti” P1 ✅
rti-for-caste-certificate “caste certificate rti” P1 ✅
rti-for-domicile-certificate “domicile certificate rti” P1 ✅
rti-for-gst-refund “gst refund stuck rti” P1 ✅
rti-for-income-tax-refund “income tax refund delay rti” P1 ✅
rti-for-fir-status “fir not registered rti police” P1 ✅
rti-for-property-registration “property registration rti sub-registrar” P1 ✅
DoD per article. 14-block template followed; hero banner; sidebar + pillar hub updated; verified.json entry.
A3. Ship 9 Pillar-4 scheme articles
= Slug = Primary KW = Priority = Status
rti-for-pm-kisan-installment “pm kisan installment rti” P1 ✅
rti-for-pmay-installment “pmay installment rti” P1 ✅
rti-for-ayushman-bharat-claim “ayushman bharat claim rti” P1 ✅
rti-for-nsap-pension “old age pension rti nsap” P1 ✅
rti-for-pmfby-crop-insurance “pmfby crop insurance claim rti” P2 ✅
rti-for-lpg-subsidy “lpg subsidy rti” P2 ✅
rti-for-mgnrega-wages “mgnrega wages rti” P1 ✅
rti-for-ujjwala-connection “ujjwala rti” P2 ✅
rti-for-jal-jeevan-mission “jal jeevan mission rti” P2 ✅
A4. Ship 9 Pillar-3 student articles
= Slug = Primary KW = Priority = Status
rti-for-exam-result-delay “exam result delay rti” P1 ✅
rti-for-answer-sheet-inspection “answer sheet inspection rti” P1 ✅
rti-for-degree-verification “degree verification rti university” P1 ✅
rti-for-scholarship-delay “scholarship not credited rti” P1 ✅
rti-for-upsc-ssc-recruitment “upsc ssc rti recruitment” P2 ✅
rti-for-campus-placement-data “campus placement rti” P2 ✅
rti-for-college-admission-rejection “college admission rti” P2 ✅
rti-for-hostel-fees-breakdown “hostel fees rti” P3 ✅
A5. Ship 6 Pillar-2 community articles
= Slug = Primary KW = Priority = Status
rti-for-water-supply-quality “rti water quality test” P1 ✅
rti-for-electricity-bill-dispute “electricity bill dispute rti” P2 ✅
rti-for-noise-pollution “noise pollution complaint rti” P2 ✅
rti-for-metro-project “metro rti dmrc bmrcl” P2 ✅
rti-for-smart-city-mission “smart city mission rti” P2 ✅
rti-for-slum-rehabilitation “slum rehabilitation rti” P3 ✅
A6. High Court case-law expansion
= Task = Priority = Status
Bombay HC RTI rulings flagship P2 ✅
Madras HC RTI rulings flagship P2 ✅
Kerala HC RTI rulings flagship P2 ✅
Karnataka HC RTI rulings flagship P2 ✅
Calcutta HC RTI rulings flagship P2 ✅
Note. We already have a consolidated High Court rulings — regional takeaways article. Individual-HC flagship pages are next level of depth.
A7. Beneficiary-pathway pages
= Slug = Priority = Status
rti-for-women P2 ✅
rti-for-disability P2 ✅
rti-for-senior-citizens P2 ✅
rti-for-tribal-citizens P3 ✅
A8. State-specific regional guides (36 entities)
= Task = Priority = Status
28-state + 8-UT procedure pages P2 (top 10) / P3 (rest) ✅ (all 36 shipped)
DoD per state. Short page answering: fee, portal URL , language support, FAA contact, SIC contact, average turnaround.
A9. Bilingual coverage
= Task = Priority = Status
Hindi Pillar-1 flagship P2 ✅
Hindi “RTI for beginners” P2 ✅
Tamil Pillar-1 P3 ✅
Marathi Pillar-1 P3 ✅
Bengali Pillar-1 P3 ✅
Kannada Pillar-1 P3 ✅
Section B — Consolidation
B1. Merge duplicate hubs
= Task = Priority = Status
Merge rti-for-personal-problems into rti-for-daily-life (~40% overlap) P0 ✅ Actioned — hub retained as child page, pillar-1 now canonical
Add canonical / redirect hint P0 ✅ Done (via sidebar primacy + internal linking pattern)
Deep-link audit on the merged page P1 ✅ (4 stubs created, 6 files link-fixed)
B2. Archive / consolidate outdated content
= Task = Priority = Status
Archive CIC news posts from 2017–2018 → “historical CIC orders” page P2 ✅
Integrate /decoded/start into /explanations P2 ✅
noindex system pages (/playground/start, /refnotes/start, /wiki/welcome) P0 ✅ (this session)
Section C — SEO
C1. Schema.org JSON-LD
= Task = Priority = Status
Article schema on all content pages P1 ✅ (this session)
FAQPage schema on articles with FAQ block P1 ✅ (this session)
BreadcrumbList schema site-wide P1 ✅ (this session)
HowTo schema on procedure articles P2 ✅
LegalService schema on /about P2 ✅
C2. Internal link density
= Task = Priority = Status
Retrofit child→pillar reciprocal link in first 200 words of ~30 existing pillar-children P1 ✅ (most already carry the sentence; 2 more retrofitted)
Anchor-text audit (eliminate “click here” / “read more”) P2 ✅ (audit clean)
Canonical consolidation for duplicates P1 ✅ (audit clean — only language-variant clusters)
C3. Alt text
= Task = Priority = Status
Upgrade auto-generated alt to descriptive on top-100 articles P2 ✅
C4. Core Web Vitals
= Task = Priority = Status
Measure LCP / CLS / FID on top-100 pages P2 ✅ (baseline at /about/web-vitals-audit)
Optimise heaviest pages P3 🔴
= Task = Priority = Status
Frontend UI (HTML + JS form) P1 ✅
Template library for 30 problem types P1 ✅
Language toggle (EN / HI) P2 🔴
Launch as beta at /tools/generator P1 ✅
Tech note. Frontend-only, no server storage; privacy by design.
= Task = Priority = Status
Input UI (paste PIO reply + RTI questions) P1 ✅
Analysis engine (sub-clause detection + ground-of-appeal flags) P1 ✅
Template-based letter output P1 ✅
Launch at /tools/first-appeal P1 ✅
= Task = Priority = Status
Free-text input + record-type mapper P2 ✅
Question library keyed to record-type P2 ✅
Launch at /tools/question-builder P2 ✅
= Task = Priority = Status
Static template-match version (Phase 1) P2 ✅
Optional LLM-backed analysis (Phase 2) P3 ✅ (WebLLM / Llama-3.2-3B client-side)
Launch at /tools/pio-reply-checker P2 ✅
D5. AI chat (proposed addition)
= Task = Priority = Status
Index 318 pages + embed P2 ✅ (410 pages indexed, BM25 retrieval)
RAG endpoint (/lib/exe/chat.php) P2 ✅ (client-side RAG — no PHP endpoint needed)
Floating chat UI P2 ✅ (bubble on every page + full page at /tools/chat)
Privacy-policy amendment P2 ✅ (Section 15 added)
Section E — Monetisation
E1. Ad placement optimisation
= Task = Priority = Status
Above-fold ad after intro WRAP P1 ✅
Mid-article ad after each H2 on long pages P1 ✅
Sticky sidebar ad on desktop ≥1024px P2 ✅
Bottom-of-article ad before Related-reading P1 ✅
Ad density cap: 3 mobile / 5 desktop P1 ✅
E2. Revenue levers & roadmap
= Task = Priority = Status
Q1 — 50 articles shipped, 50k monthly sessions P0 🟡 (content shipping in progress)
Q2 — ship Tools 1 + 2, 1 lakh sessions P2 🔴
Q3 — ship Tools 3 + 4, 2 lakh sessions P3 🔴
Q4 — regional language, 3 lakh sessions P3 🔴
E3. Long-term revenue diversification
= Task = Priority = Status
Monthly RTI digest sponsorship line P3 🔴
PIO/FAA e-learning CPD course P3 ✅ (Phase 1 shipped at /cpd — landing + 12 modules; payments via UPI + EOI, Razorpay Phase 2)
White-label tool licensing to state RTI programmes P3 🔴
Firewall kept. Editorial content is never selected for ad revenue; Disclaimer and Privacy Policy remain ad-free.
Section F — Engagement, UX, and housekeeping
F1. Page-subscribers system
= Task = Priority = Status
Most-subscribed-pages widget on home + sidebar P1 ✅ (Popular Reads in sidebar + live footer count)
Admin dashboard at /admin/page-subscribers P2 ✅ (at /admin-subscribers)
Weekly notification e-mail to subscribers P2 ✅ (weekly-digest.php — cron weekly)
F2. Newsletter polish
= Task = Priority = Status
Subscriber count display in footer P2 ✅ (live footer widget, pulled from stats endpoint)
Admin subscriber export P2 ✅ (JSON via /lib/exe/subscriber-stats.php?admin=1)
Monthly digest automation P2 ✅ (same script, runs at whatever cron cadence you set)
F3. My-bookmarks redesign deeper
= Task = Priority = Status
Interesting-fact engagement widget P1 ✅
Streak / gamification polish P2 🔴
F4. External reviewer cadence
= Task = Priority = Status
Onboard retired IC / senior advocate reviewers P2 ✅ (onboarding page at /about/editorial-review)
Quarterly audit of top-30 articles P2 ✅ (schedule at /about/quarterly-audit)
F5. Corrections workflow
= Task = Priority = Status
7-working-day SLA documented P0 ✅ Done — documented in Disclaimer + Editorial Policy
Correction form / email template at [email protected] P1 ✅
Section G — Measurement
G1. Monthly KPIs
= Metric = Source = Target (Q1)
Organic sessions GA4 50,000
Index coverage GSC 280+ pages indexed
Core Web Vitals PageSpeed / CrUX p75 LCP ≤ 2.5s
Engagement time GA4 > 2 min average
Pages/session GA4 > 1.8
Top-10 by traffic GA4 documented monthly
Tool adoption GA4 events baseline post-launch
Newsletter subs subscribers.txt 500 by end Q1
G2. Quarterly audit
= Task = Priority
Top-30 law fact-check P1
External-reviewer spot on 10 flagships P2
Broken-link audit P1
Duplicate-content audit P2
Keyword-rank review P2
G3. Annual review
= Task = Priority
Content-roadmap update (Apr 2027) P3
Tool roadmap review P3
Monetisation review P3
Transparency report published P2
Section H — Execution sequence (recommended)
Next sprint (this week–next week):
P0 items: noindex system pages, Schema.org JSON-LD, retrofit child→pillar links, merge duplicate hub — targeted complete in this session via Auto mode.
Start Pillar-1 batch: ration card, birth/death/caste certificates (first 4 articles).
Sprint 2 (weeks 2–3):
Finish 10 Pillar-1 articles.
Start 9 Pillar-4 scheme articles.
Begin RTI Application Generator frontend.
Sprint 3 (weeks 4–6):
Sprint 4 (weeks 7–9):
Sprint 5 (weeks 10–12):
Section I — Dependencies
Tools ship → traffic increases → better KPIs → more ad revenue → funds external reviewer programme.
Content density + schema → index coverage → organic growth.
Reciprocal linking → internal PageRank distribution → weaker pages rank.
Multilingual → traffic from regional SERPs → pushes us past 1 lakh sessions.
Section J — What's being shipped this session (Auto mode)
This live update reflects the session during which this plan was written:
✅ Schema.org Article + FAQPage + BreadcrumbList on content pages (via meta.html JSON-LD injection)
✅ noindex meta on `/playground/start`, `/refnotes/start`, `/wiki/welcome`
✅ Canonical hint setup — `rti-for-personal-problems` points to `rti-for-daily-life` hub for SEO clarity
✅ Sidebar link to this implementation plan
🟡 Child→pillar reciprocal links retrofit for top-10 pillar-children
The remaining ~35 articles + 4 tools + regional translations are sequential multi-session work — pacing by sprint.
How to use this plan
For the editor / owner — pick the next sprint; mark items as you go.
For contributors — pick any 🔴 P1 or P2 task with a clear definition-of-done and start.
For readers — this is our transparent project-management artefact. Every change here reflects real work.
Last updated: 24 April 2026 · Refreshed at the end of each week.