Right to Information Wiki
How to file an RTI for pothole / road not repaired in Howrah

File an RTI for pothole / road not repaired in Howrah: city PIO, fee, portal, sample template, escalation. Howrah Municipal Corporation (HMC) specific.

no way to compare when less than two revisions

Differences

This shows you the differences between two versions of the page.


city-service:howrah:road-repair [2026/05/05 01:38] (current) – created - external edit 127.0.0.1
Line 1: Line 1:
 +{{htmlmetatags>metatag-keywords=(rti for pothole / road not repaired in Howrah, Howrah pothole / road not repaired rti, howrah rti, howrah municipal corporation (hmc) rti, file rti Howrah)
 +metatag-description=(File an RTI for pothole / road not repaired in Howrah: city PIO, fee, portal, sample template, escalation. Howrah Municipal Corporation (HMC) specific.)}}
 +
 +====== How to file an RTI for pothole / road not repaired in Howrah ======
 +
 +{{page>snippets:dpdp-banner}}
 +
 +<WRAP info>**Direct answer.** In Howrah (West Bengal), file your RTI for **pothole / road not repaired** to **Howrah Municipal Corporation (HMC) (Municipal Engineer / PWD Executive Engineer)**. Fee: Rs. 10 IPO (state default; verify against [[:state-scheme:west-bengal:start|West Bengal state RTI rules]]). **Online portal**: [[https://www.myhmc.in/]] (where the relevant department offers e-service). Reply mandatory in 30 days under §7(1) RTI Act 2005.</WRAP>
 +
 +===== Quick facts (Howrah) =====
 +| **City** | Howrah (West Bengal) |
 +| **Subject** | RTI for pothole / road not repaired |
 +| **Municipal body** | Howrah Municipal Corporation (HMC) |
 +| **City context** | HMC has 50 wards across 5 boroughs |
 +| **Target office** | Howrah Municipal Corporation (HMC) (Municipal Engineer / PWD Executive Engineer) |
 +| **Online portal** | [[https://www.myhmc.in/]] |
 +| **State portal** | [[:state-scheme:west-bengal:start|West Bengal state RTI hub]] |
 +| **Reply window** | 30 days (§7(1) RTI Act 2005) |
 +| **Statutory anchor** | PWD Manual; municipal liability for accident-causation |
 +
 +===== Why this page exists =====
 +The general guide on **[[:rti-for-road-repair-delay|RTI for pothole / road not repaired]]** covers the full template, decision steps, case law and FAQs. **This page focuses on the Howrah-specific bits**: which municipal department to file at, what fee mode Howrah Municipal Corporation (HMC) accepts, the local portal (if any), and where to escalate within West Bengal.
 +
 +===== Filing in Howrah — 4 steps =====
 +  - **Identify the office**. Howrah Municipal Corporation (HMC) (Municipal Engineer / PWD Executive Engineer) typically sits at Howrah Municipal Corporation (HMC) headquarters or the relevant zonal office.
 +  - **Pay the fee**: Rs. 10 IPO/cash; check the [[:state-scheme:west-bengal:start|West Bengal hub]] for any state-specific fee.
 +  - **File**: online via [[https://www.myhmc.in/]] OR by Speed Post to Howrah Municipal Corporation (HMC) (with acknowledgment).
 +  - **Track**: 30-day clock starts from receipt by the public authority.
 +
 +===== If you don't get a reply =====
 +  - **Day 31**: file First Appeal under §19(1) to the FAA (typically the Municipal Commissioner of Howrah Municipal Corporation (HMC)).
 +  - **Day 75-76**: file Second Appeal to the **West Bengal State Information Commission**.
 +  - **Parallel pressure**: Use the Howrah Municipal Corporation (HMC) grievance portal (if available) and CPGRAMS (//pgportal.gov.in//).
 +
 +===== Howrah-specific tips =====
 +  * For city-wide patterns (not just your case), check **[[:service-city:road-repair:|RTI for pothole / road not repaired in West Bengal]]** for the state-level template.
 +  * If Howrah Municipal Corporation (HMC) has multiple zones/wards, address your application to the **zonal officer** of your specific zone — saves time on internal routing.
 +  * Photograph the building/road/issue with a timestamp before filing — strengthens any subsequent enforcement action.
 +
 +===== Related =====
 +  * [[:city-service:howrah:start|All RTI services for Howrah]]
 +  * [[:service-city:road-repair:start|RTI for pothole / road not repaired across all cities]]
 +  * [[:service-city:road-repair:|West Bengal state-level guide]]
 +  * [[:rti-for-road-repair-delay|Master guide: RTI for pothole / road not repaired]]
 +
 +===== Sources =====
 +  * RTI Act 2005 §§6, 7, 19.
 +  * PWD Manual; municipal liability for accident-causation.
 +  * Howrah Municipal Corporation (HMC) citizen-services portal.
 +
 +//Last reviewed: 25 April 2026.//
 +
 +{{tag>howrah road-repair city-service citizen-rti rti-template}}