Differences
This shows you the differences between two versions of the page.
| — | guide:applicant:application:sample:electricity-complaint [2026/06/03 17:01] (current) – created - external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | {{htmlmetatags> | ||
| + | metatag-description=(Power cuts, voltage swings or wrong electricity bill? Free RTI to your DISCOM. Sample letter, first appeal text, sources, FAQs. Citizen guide 2026.)}} | ||
| + | |||
| + | ====== Sample RTI: DISCOM Power Cut, Voltage Fluctuation and Bill Dispute Records ====== | ||
| + | |||
| + | {{: | ||
| + | |||
| + | <WRAP center round tip 100%> | ||
| + | **Direct answer.** For a power cut beyond the SoP window, voltage outside the IS 12360 tolerance, or a disputed bill, file a free RTI to the **Public Information Officer of your DISCOM** (BSES Rajdhani, Tata Power, BESCOM, MSEDCL, KSEB, KESCo, etc.) and a copy to the **State Electricity Regulatory Commission**. Cite Sections 43, 57 and 142 of the Electricity Act, 2003. Reply due in 30 days under Section 7(1) of the RTI Act, 2005. Fee: Rs 10 (BPL: nil). | ||
| + | </ | ||
| + | |||
| + | ===== When to use this RTI ===== | ||
| + | |||
| + | * New connection delayed beyond 30 days from completed application (Section 43 of the Electricity Act, 2003). | ||
| + | * Repeated unscheduled outages on your feeder. | ||
| + | * Voltage fluctuation outside +/- 6% of declared voltage (IS 12360). | ||
| + | * Transformer failure with restoration delayed past the SoP window. | ||
| + | * Bill dispute: average billing for a working meter, slab miscalculation, | ||
| + | * Disconnection without 15-day Section 56 notice. | ||
| + | * Penalty / late-payment surcharge added on a disputed bill. | ||
| + | * Compensation under SoP regulations not credited despite repeated outages. | ||
| + | |||
| + | ===== When NOT to use this RTI ===== | ||
| + | |||
| + | * **Quick service complaint**: | ||
| + | * **Compensation claim by suit**: file before the **Consumer Grievance Redressal Forum (CGRF)** of the DISCOM under the Electricity Act, 2003; an RTI prepares evidence for that forum but does not award compensation. | ||
| + | * **Asking about a neighbour' | ||
| + | * **Bulk-tariff policy challenge**: | ||
| + | |||
| + | ===== Drafting notes ===== | ||
| + | |||
| + | * State your **Consumer Number / Service Connection Number / K-Number**. | ||
| + | * Specify the **disputed period** with start and end dates. | ||
| + | * Quote the **DISCOM SoP Regulations** of your State, which fix time-bound restoration and compensation. | ||
| + | * Ask for the **transformer feeder log**, the **outage register**, and the **complaint redressal SLA report**. | ||
| + | * For voltage issues, ask for the **voltage profile** at your distribution transformer. | ||
| + | * For bill disputes, ask for the **meter test certificate** and the **tariff schedule** in force. | ||
| + | * Send by Speed Post (Acknowledgement Due). | ||
| + | |||
| + | ===== Privacy caution ===== | ||
| + | |||
| + | You may ask for **your own connection records, the published tariff order, the SoP regulations, | ||
| + | |||
| + | ===== Sample format ===== | ||
| + | |||
| + | < | ||
| + | To | ||
| + | The Public Information Officer | ||
| + | [DISCOM name, e.g., BSES Rajdhani Power Limited / Tata Power Delhi Distribution | ||
| + | / BESCOM / MSEDCL / Kerala State Electricity Board / KESCo Kanpur, etc.] | ||
| + | [Full postal address, PIN] | ||
| + | |||
| + | Subject: Application under Section 6(1) of the Right to Information Act, 2005: | ||
| + | | ||
| + | |||
| + | Sir / Madam, | ||
| + | |||
| + | 1. I, [Full name], a citizen of India residing at [full address], apply under | ||
| + | | ||
| + | |||
| + | 2. Particulars for record-identification: | ||
| + | | ||
| + | | ||
| + | | ||
| + | | ||
| + | |||
| + | 3. Information sought (please supply certified copies): | ||
| + | (a) Certified copy of my connection-application file with all sanction | ||
| + | and load-enhancement orders. | ||
| + | (b) Outage log for my distribution transformer / feeder for the disputed | ||
| + | | ||
| + | (c) Restoration time recorded against each outage and the SoP-compliance | ||
| + | | ||
| + | (d) Voltage profile recorded at my distribution transformer for the | ||
| + | | ||
| + | (e) Certified copy of the meter test certificate, | ||
| + | | ||
| + | (f) Certified copy of the tariff schedule in force on the dates of the | ||
| + | | ||
| + | (g) My complaint-redressal log (1912 / call centre / app) for the | ||
| + | | ||
| + | (h) Certified copy of the SoP-compliance compensation worksheet, if any | ||
| + | | ||
| + | (i) Name, designation and office address of the officer presently holding | ||
| + | my file. | ||
| + | |||
| + | 4. I enclose the prescribed application fee of Rs 10 by way of Indian Postal | ||
| + | Order in favour of the Accounts Officer of the DISCOM. | ||
| + | |||
| + | 5. Please send the reply to the address below by Registered Post. | ||
| + | |||
| + | Yours faithfully, | ||
| + | Signature | ||
| + | Name : ___________________ | ||
| + | Address : ___________________ | ||
| + | Date : ___________________ | ||
| + | </ | ||
| + | |||
| + | ===== First appeal wording ===== | ||
| + | |||
| + | < | ||
| + | To | ||
| + | The First Appellate Authority | ||
| + | [DISCOM name] | ||
| + | |||
| + | Subject: First appeal under Section 19(1) of the Right to Information Act, 2005: | ||
| + | | ||
| + | |||
| + | Sir / Madam, | ||
| + | |||
| + | 1. I filed RTI dated [DD/ | ||
| + | | ||
| + | |||
| + | 2. The 30-day period under Section 7(1) of the RTI Act, 2005 expired on | ||
| + | | ||
| + | |||
| + | 3. I therefore appeal under Section 19(1) and pray that the PIO be directed | ||
| + | to supply the records sought within the time fixed by you. | ||
| + | |||
| + | 4. I draw attention to Section 19(8)(a)(i) on costs and Section 20(1) on | ||
| + | | ||
| + | |||
| + | Yours faithfully, | ||
| + | Signature | ||
| + | Name : ___________________ | ||
| + | Address : ___________________ | ||
| + | Date : ___________________ | ||
| + | </ | ||
| + | |||
| + | ===== Sources ===== | ||
| + | |||
| + | * [[https:// | ||
| + | * [[https:// | ||
| + | * [[https:// | ||
| + | * The Electricity Act, 2003: Sections 43 (new connection), | ||
| + | * Bureau of Indian Standards IS 12360: voltage tolerance for distribution. | ||
| + | * The Right to Information Act, 2005, Sections 6(1), 7(1) and 19(1). | ||
| + | |||
| + | ===== FAQs ===== | ||
| + | |||
| + | ==== What is the SoP window for power restoration? | ||
| + | |||
| + | Each State Electricity Regulatory Commission notifies its own **Standards of Performance Regulations**. Typical urban window: **2 hours for normal fault**, **24 hours for transformer failure**, **48 hours for storm-related damage**. The exact figure for your State is available from the SERC's published SoP order, and your RTI should ask for it. | ||
| + | |||
| + | ==== Can I claim compensation through the RTI? ==== | ||
| + | |||
| + | Not directly. The RTI gives you the **outage log + SoP compliance record**. Take that record to the **Consumer Grievance Redressal Forum (CGRF)** of the DISCOM, which can award compensation under the Electricity Act, 2003 read with the SoP regulations. | ||
| + | |||
| + | ==== Is the meter test free? ==== | ||
| + | |||
| + | The first test on the consumer' | ||
| + | |||
| + | ==== Voltage fluctuation has burnt my appliances; what do I ask in the RTI? ==== | ||
| + | |||
| + | Ask for the **voltage profile at your distribution transformer**, | ||
| + | |||
| + | ==== The bill is wrong but the disconnection notice is already issued. ==== | ||
| + | |||
| + | Pay the undisputed portion under protest, lodge a written dispute, and file the RTI immediately. Most SERCs prohibit disconnection for the disputed amount during the pendency of a CGRF complaint, but you must record the dispute in writing first. | ||
| + | |||
| + | ===== Internal links ===== | ||
| + | |||
| + | * [[https:// | ||
| + | * [[guide: | ||
| + | * [[guide: | ||
| + | * [[guide: | ||
| + | * [[guide: | ||
| + | * [[guide: | ||
| + | |||
| + | **Last reviewed: 9 May 2026** | ||
| + | |||
| + | //Sources verified against the Electricity Act, 2003, model SoP regulations published by the Forum of Regulators, the Right to Information Act, 2005, and DISCOM tariff orders as on 9 May 2026.// | ||
| + | |||
| + | {{tag> | ||