Right to Information Wiki

Encyclopedia on RTI for everyone
You will find the Guide to Online RTI.

User Tools

Site Tools


guide:applicant:application:sample:road-work

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revisionBoth sides next revision
guide:applicant:application:sample:road-work [2015/12/06 03:51] – created Shrawanguide:applicant:application:sample:road-work [2016/04/17 10:42] Shrawan
Line 10: Line 10:
   - Exact location, with copies of sketches to indicate, for which the permission was granted to each agency, to cut the road.   - Exact location, with copies of sketches to indicate, for which the permission was granted to each agency, to cut the road.
   - Confirmation if each of these agencies adhered to the locations for which permission was granted or if there was any deviation during execution.   - Confirmation if each of these agencies adhered to the locations for which permission was granted or if there was any deviation during execution.
-  - Details of the deposit money utilized by corporation with a complete list of all the works carried out through the use of this deposit money indicating the name of work, amount allocated under that work, and the location which was repaired under each work, with  copy of the sketch.</blockquote>+  - Details of the deposit money utilized by corporation with a complete list of all the works carried out through the use of this deposit money indicating the name of work, amount allocated under that work, and the location which was repaired under each work, with  copy of the sketch. 
 +</blockquote> 
 +---- 
 +[<>]
guide/applicant/application/sample/road-work.txt · Last modified: 2018/02/01 02:36 by Shrawan