Quick Reply: Jal Jeevan Mission — Har Ghar Jal — has run since August 2019 to give every rural household a functional tap water connection, with a Central outlay of ₹2,08,652 crore for 2019-24 (PIB, December 2025). Every village's scheme, tests and funds exist as records. When a connection exists on paper but not at the tap, file for the scheme file, the quality tests and the fund trail — ₹10, 30 days, to the PHED or rural-water PIO.
Scheme: JJM — Har Ghar Jal, since August 2019
Outlay: ₹2,08,652 crore Central, 2019-24 (PIB)
Dashboard: jjm.gov.in / ejalshakti.gov.in
Your village records: scheme file, water-quality tests, fund releases
RTI to: PHED / Rural Water Supply Department PIO
Fee: ₹10 — 30-day clock
A tap connection has three lives: the dashboard entry, the pipe, and the water. The dashboard is public, the pipe is in your lane, and the water — or its absence — is in your bucket. RTI lives in the gap between the first and the third.
None of this is secret; all of it is exactly what a stalled scheme stops producing at the village board.
1. Copy of the approved Village Action Plan / scheme file for village ____, block ____, including source, works, and completion dates. 2. The date the scheme for village ____ was declared complete, and the functional household connections reported from it. 3. Copy of the water-quality test results for the source of village ____ for the last 12 months, with the testing laboratory. 4. The funds released, received and spent on the village ____ scheme, year-wise. 5. The number of complaints of non-functional household connections in block ____, and how many were resolved.
Send it to the Public Health Engineering Department (PHED) / Rural Water Supply Department of the state — JJM runs with states, and the village file sits with the implementing department's district division. ₹10, 30 days; first appeal to the department's FAA; second to the State Information Commission.
1. **Complaint first** — the department's own grievance channel or helpline; the RTI that follows can then ask for the complaint's status too 2. **Photograph the board** — the village information board is supposed to display scheme and test details; a photo of an empty board is evidence 3. **The Gram Sabha** — JJM works are to be vetted in it; the RTI can ask for the resolution's copy 4. **Water quality above all** — for contamination, the health system and the test record move faster together than either alone
Real example. Dr. Shrawan Kumar Pathak's village showed “completed” for two years while the overhead tank ran dry weekly. The scheme-file copy showed the balancing tank paid for but never built; the quality results ran fourteen months stale. The first appeal — never needing the Commission — produced a restoration order for the tank line within a season.
The Centre's mission, running with the states since August 2019, to give every rural household a functional tap water connection — Har Ghar Jal.
Yes — they are records of the testing programme; ask for the source's results for the last 12 months with the testing laboratory named.
The state's PHED or Rural Water Supply Department — the implementing authority whose division holds the village scheme file.
Functional household connections are the unit of coverage; in-village distribution to the household is part of the scheme works.
Last reviewed: 26 August 2026. Outlay, utilisation and extension figures per the PIB release of 1 December 2025; dashboards verified live on this run.