Table of Contents

How to apply for PMAY housing subsidy — Urban + Rural (2026)

Quick answer: PMAY has two streams: (1) PMAY-U (Urban) — Credit-Linked Subsidy Scheme (CLSS) for first home buyers — interest subsidy 3-6.5% on loan up to Rs 6L; (2) PMAY-G (Gramin) — direct grant Rs 1.2L (plain) or Rs 1.3L (hilly/NE) for landless/kuccha-house families to build pucca house. PMAY-U closed for new applications March 2022; PMAY 2.0 launched September 2024 with revised norms. PMAY-G ongoing; SECC 2011 list-based.

Who can apply (eligibility)

Step-by-step process

  1. Check eligibility (PMAY-U 2.0) — pmay-urban.gov.in/PMAYMIS/Open/Beneficiary_DetailsViewer.aspx — verify income + first-home + no land status.
  2. PMAY-U: Apply online at pmaymis.gov.in — Fill Aadhaar + family income + employment proof. No fee.
  3. PMAY-U: Apply via bank/HFC — When taking home loan, bank applies CLSS on your behalf. Subsidy credited to loan account.
  4. PMAY-G: Check SECC 2011 inclusion — awaassoft.nic.in/netiay/Benificiary.aspx — search by Aadhaar / name / state. If not in list, apply for review at Block Office.
  5. PMAY-G: Block-level verification — BDO + Patwari verify house condition + Aadhaar + bank account.
  6. PMAY-G: Approval + sanction — Sanction in 3 instalments: Rs 25K (foundation) + Rs 50K (lintel) + Rs 50K (completion) — bank-credited.
  7. PMAY-G: Construction monitoring — GIS-tagged photos at each stage. Geotagging mandatory before next instalment.
  8. Track status — pmaymis.gov.in (urban) or awaassoft.nic.in (gramin). e-Receipt for both.

Where to apply, fee, and timeline

What documents to keep ready

See our complete checklist: Documents required for pmay housing — covers mandatory + optional + size/format specs.

Common issues + how to handle

If your application is delayed or rejected — file an RTI

Most “delays” or “rejections” clear within 7-15 days of an RTI being filed. Use this 5-question template:

1. Status of my application no. _____ dated _____ as on date.
2. The name + designation of the dealing officer assigned to my file.
3. The reasons for delay beyond the statutory timeline.
4. Copy of any noting / movement of my file in the past 30 days.
5. The likely date of issuance of my certificate / approval.

Auto-fill the PIO details + your case: Open the RTI Drafter →

Or browse state-wise scheme procedures: All state portals + RTI templates

Track your application status: How to check status guide

Frequently asked questions

PMAY-U closed — what now?

PMAY 2.0 launched Sept 2024: revised income limits, focus on EWS/LIG, new urban poor categories. Apply at pmay-urban.gov.in.

Can I get PMAY for second home?

No — only first pucca house. Renovation of existing pucca house also not covered.

Land for PMAY-G — must I own land?

Yes — own house plot needed. Landless: state govt provides plot first under Indira Awaas Yojana (Land) component.

Subsidy taxable?

No — both CLSS and direct grant are exempt under §10(15A) Income Tax Act.

PMAY application stuck >90 days?

File RTI to MoHUA / BDO. Use our PMAY RTI generator.

Summary + what to do next

Bottom line: Apply at PMAY portal (https://pmay-urban.gov.in). Fee: Free application · CLSS subsidy: 3-6.5% on loan up to Rs 6L · Direct grant (gramin): Rs 1.2-1.3L. Timeline: PMAY-U: 30-90 days for CLSS subsidy credit · PMAY-G: 6-12 months from sanction to completion + final instalment. If delayed beyond timeline, file an RTI — most cases clear within 15 days.

Sources

Last reviewed: 25 April 2026.