guide:applicant:application:sample:road-work
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
guide:applicant:application:sample:road-work [2016/05/13 18:28] – Raveena | guide:applicant:application:sample:road-work [2018/02/01 02:07] – Shrawan | ||
---|---|---|---|
Line 13: | Line 13: | ||
**Sample for improper road maintenance** | **Sample for improper road maintenance** | ||
+ | |||
+ | < | ||
+ | <script async src="// | ||
+ | <ins class=" | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | < | ||
+ | | ||
+ | </ | ||
+ | </ | ||
<WRAP center round box 90%> | <WRAP center round box 90%> | ||
Line 75: | Line 88: | ||
**Sample for Battered Road surface and damaged Asphalting** | **Sample for Battered Road surface and damaged Asphalting** | ||
+ | < | ||
+ | <script async src="// | ||
+ | <ins class=" | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | < | ||
+ | | ||
+ | </ | ||
+ | </ | ||
<WRAP center round box 90%> | <WRAP center round box 90%> | ||
Line 129: | Line 154: | ||
</ | </ | ||
**Sample for Road Cutting / Digging leading to bad road** | **Sample for Road Cutting / Digging leading to bad road** | ||
+ | < | ||
+ | <script async src="// | ||
+ | <ins class=" | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | | ||
+ | < | ||
+ | | ||
+ | </ | ||
+ | </ | ||
+ | |||
<WRAP center round box 90%> | <WRAP center round box 90%> | ||
Line 178: | Line 216: | ||
</ | </ | ||
+ | ==== More questions on Road Construction ==== | ||
- | Please check the mode of payment of RTI Application Fee and Application Format (if any) from your [[http:// | + | These questions were asked by the RTI Applicant and through were denied by the CPIO, was allowed by Central Information Commission. (({{ : |
+ | - Name, current posting address and mobile number of Junior Engineer, Assistant Engineer under whom supervision of this works will take place. | ||
+ | - Certified copy of approved list of Manufacturer’s / | ||
+ | - Certified copy of all the invoice /Challan / | ||
+ | - Certified copy of MAS register. | ||
+ | - Certified copy of completion certificate of the work. (If the work has been completed) or if the work has not been completed mention the reasons of delayed along with the actual date of completed of work.) | ||
+ | - Certified copy of Abstract of cost of first and final bill. | ||
+ | - Certified copy of Schedule of Quantity. | ||
+ | - Measurement book. (If work has under execution, provide the MB for till Now.) | ||
+ | |||
+ | |||
+ | Please check the mode of payment of RTI Application Fee and Application Format (if any) from your [[[[rules:|State RTI Rules]]]] | ||
In case word limit per RTI Application is prescribed under RTI Rules applicable to the public authority concerned, more than one RTI application may be filed //(with different dates, to identify reply of PIO with respect to each such application)// | In case word limit per RTI Application is prescribed under RTI Rules applicable to the public authority concerned, more than one RTI application may be filed //(with different dates, to identify reply of PIO with respect to each such application)// | ||
Line 188: | Line 238: | ||
+ | {{ : |
guide/applicant/application/sample/road-work.txt · Last modified: 2018/02/01 02:36 by Shrawan