guide:applicant:application:sample:illegal-construction
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Last revisionBoth sides next revision | ||
guide:applicant:application:sample:illegal-construction [2016/05/13 18:25] – Raveena | guide:applicant:application:sample:illegal-construction [2016/05/15 09:13] – Raveena | ||
---|---|---|---|
Line 4: | Line 4: | ||
{{like> | {{like> | ||
- | There may be situations where you will find that a public land is encroached upon and new constructions are started. | + | There may be situations where you will find that a public land is encroached upon and new constructions are started. |
+ | **For illegal Construction of Additional Floors** | ||
<WRAP center round box 90%> | <WRAP center round box 90%> | ||
Line 49: | Line 49: | ||
</ | </ | ||
+ | |||
+ | |||
+ | **For Encroachment upon public land and illegal construction** | ||
+ | |||
+ | <WRAP center round box 90%> | ||
+ | |||
+ | To\\ \\ | ||
+ | The Central Public Information Officer \\ | ||
+ | Name of Public Authority\\ | ||
+ | Full address of the public authority\\ | ||
+ | Pin Code....\\ \\ | ||
+ | Sub: Request for information under Section-6(1) of RTI Act.\\ \\ | ||
+ | Sir, \\ \\ | ||
+ | Please supply me the following information with respect to proposed construction / construction work being carried out at below mentioned property:\\ \\ | ||
+ | **Details of site & construction: | ||
+ | Plot No:\\ | ||
+ | City survey No:\\ | ||
+ | Ward No:\\ | ||
+ | Street No:\\ | ||
+ | Name of builder/ | ||
+ | Name of Housing Scheme (as displayed): | ||
+ | **Particulars of Information sought:** \\ \\ | ||
+ | [1] Certified copy of the Sanctioned building plan including floor plans with respect to construction of buildings / dwelling units at above detailed plot / address. | ||
+ | |||
+ | [2] Certified copy of the Application submitted by the builder / developer along with all its enclosures, including the title deed of land, for seeking approval for construction of building at the above detailed plot / address. | ||
+ | |||
+ | [3] Certified copy of the note-sheet indicating notings by various officials and approval of competent authority thereby granting permission for construction of building in above detailed plot / address. | ||
+ | |||
+ | [4] Inform me the name, designation, | ||
+ | |||
+ | [5] Certified copy of the site inspection report / feasibility report / verification report submitted by the concerned officer(s) based on which sanction has been accorded for construction of building at the above detailed plot/ | ||
+ | |||
+ | [6] Certified copy of the survey map / town planning map indicating the approved classification and utility of above mentioned plot/ | ||
+ | |||
+ | [7] certified copy of sanction letter for construction of building at the above detailed plot / address. | ||
+ | |||
+ | [8] certified copy of communication / sanction indicating the permissible FSI in respect of construction of building at the above detailed plot / address. | ||
+ | |||
+ | [9] certified copy of commencement letter for the construction of buildings at the above detailed plot / address. | ||
+ | |||
+ | [10] certified copy of the building bylaws or building regulations or any such other document indicating the provision to regulate construction of building or structures or housing schemes on plots / land falling under the territorial jurisdiction of your public authority. | ||
+ | |||
+ | [11] If no such sanction for construction is accorded by your public authority, please inform me the name, designation, | ||
+ | |||
+ | Application Fee: Rs.10/ | ||
+ | |||
+ | Please send the information to my below address by Registered post. | ||
+ | |||
+ | Yours faithfully, | ||
+ | |||
+ | |||
+ | Signature\\ | ||
+ | Name ………………\\ | ||
+ | Full Address …………… \\ | ||
+ | PIN Code\\ \\ | ||
+ | |||
+ | Date: \\ | ||
+ | |||
+ | </ | ||
+ | |||
// Strike out the whichever option is not necessary, depending upon the nature of construction i.e. encroachment or additional construction on existing building. // | // Strike out the whichever option is not necessary, depending upon the nature of construction i.e. encroachment or additional construction on existing building. // |
guide/applicant/application/sample/illegal-construction.txt · Last modified: 2016/05/15 09:23 by Raveena